Cut Electricity
Bills by 40–60%.
Zero Cost to You.
Israel's leading BESS engineering and installation consultancy for residential and commercial buildings. Integrated with Standard 5281 green building certification.
Who are you?
Your Diesel Generator Is Costing You More Than You Think
High maintenance, fuel costs, noise complaints, and rising electricity tariffs are eating into every building's budget. There is a better way.
Annual maintenance contracts, fuel costs, noise violations, and the risk of failure during critical moments — plus Israel's daytime electricity tariffs climbing past 118 agorot/kWh at peak hours. Every month the generator runs, you pay twice.
A Battery Energy Storage System charges at night when electricity costs roughly 30 agorot/kWh, then discharges during peak hours and emergencies. No fuel, no noise, no maintenance crew. The system pays for itself and then saves you money every year after that.
Three steps to energy independence
Our engineering team analyses your building's consumption profile, generator load, and grid connection. You receive a detailed savings projection within one week.
Razore Engineering handles permits, grid interface, and physical installation. The system integrates with your existing infrastructure — no disruption to residents.
The BESS charges overnight, discharges at peak hours, and takes over from the grid during outages — all autonomously. Monitor performance remotely, in real time.
Get a free energy audit for your building
Submit your details and our team replies within 24 hours with a custom savings projection based on your building's profile.
Message on WhatsApp+972 53-644-4400 · Our team replies within 24 hours
Standard 5281 Is a Requirement.
BESS Makes It an Advantage.
Green building certification and energy compliance are table stakes. The developers who win are those who treat BESS not as a cost centre but as infrastructure that commands premium pricing.
Standard 5281 covers five independent engineering domains. Most developers coordinate four or five separate consultants, each with their own timeline and deliverable format — creating delays, version conflicts, and budget overruns.
Thermal performance, acoustic design, energy systems, hydrology, and electromagnetic radiation — all modelled and delivered by one integrated team. BESS is embedded from the planning stage, not retrofitted as an afterthought.
All five categories. One engineering team.
Tenants and end-buyers increasingly evaluate energy autonomy as a tier-one feature. Buildings with documented BESS infrastructure are positioned ahead of the market — not catching up to it. Our engineering team can quantify the expected premium for your specific project.
Proven at scale. Running today.
A full-scale Tesla Megapack 2 deployment, integrated by Razore Engineering. The system provides autonomous grid support, peak-shaving, and backup power for an entire community — with remote monitoring and zero scheduled maintenance downtime.
Charges at off-peak night rates (30 agorot/kWh), discharges during peak demand periods to avoid grid tariffs exceeding 118 agorot/kWh.
Talk to our engineering team
Whether you are at schematic design or approaching permit submission, our engineers can assess how BESS fits your project — and what it means for your 5281 compliance path.
Our team replies within 24 hours
You Already Pay for Electricity.
Now Make Money From It.
If your facility spends more than \u20aa80,000/month on electricity, you are sitting on an untapped asset. BESS smart storage integrates into your existing infrastructure and cuts your bill by 40–60% — with zero investment required on your side.
The system is financed, installed, and operated by our team. You do not pay for hardware, installation, or maintenance. In return, you receive a guaranteed reduction on your electricity bill every month. You spend less on something you already pay for — from day one.
What 40–60% actually means at scale
Four steps from conversation to savings
We analyse 12 months of your electricity invoices. Within one week you receive a projection showing exactly how much you will save per month — no commitment required.
Razore Engineering designs the optimal BESS configuration for your load profile. We handle all permits, grid interface approval, and installation logistics.
Fully managed by our in-house team. No third-party contractors, no coordination burden on your staff. Typical installation timeline: 6–8 weeks from agreement.
The system runs autonomously. Remote monitoring, firmware updates, and performance optimisation are handled by our team. You receive a monthly savings report and pay less every billing cycle.
BESS reduces your facility’s carbon footprint, supports IS 5281 and LEED certification, and qualifies for green building incentives. For institutional tenants, ESG compliance is no longer optional — it’s a lease requirement. Our team provides the documentation and certification support your facility needs.
Tell us your monthly electricity spend
That's all we need to calculate your savings. No technical details required. Our team does the rest and comes back to you with a concrete number within one week.
Our team replies within 24 hours
Indicative estimate based on 40–60% reduction. Actual savings depend on consumption profile, tariff structure, and system configuration.
Four steps, running automatically
The system requires no daily intervention. Once installed, BESS monitors grid conditions and operates autonomously.
Charges from the grid between 23:00–07:00 at the off-peak rate of approximately 30 agorot/kWh
Releases stored energy during high-tariff hours, cutting your grid draw when electricity costs 118+ agorot/kWh
The system calculates the optimal charge/discharge cycle daily based on real-time tariffs and building demand
Full visibility into battery state, savings accrued, and system health — accessible from any device, anywhere
Not just a battery.
An intelligent energy asset.
While most providers sell hardware and hand you the keys, our system thinks. It reads the grid, predicts tomorrow's tariffs, and optimises every single charge cycle — automatically, 24 hours a day, with no action required from you.
Every watt tracked.
Every shekel optimised.
Our Energy Management System doesn't just monitor — it decides. It simultaneously reads your battery BMS, inverter, grid operator data, and live weather forecasts, then executes the most profitable configuration around the clock, automatically.
Deployments that speak for themselves
Full technical specifications and deployment documentation available upon request — contact our team.
Frequently Asked Questions
Ready to see what BESS can do
for your building?
Whether you manage a residential block or are designing a new development, our engineering team can model the precise impact for your project — at no cost and no obligation.
DDG & Razore Engineering · +972 53-644-4400 · orr@razore.co.il · Our team replies within 24 hours